Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Audits Comptroller & Auditor General

BharatNet: 33.20% of service-ready GPs operational as of November 2025

This audit examined the performance, planning, implementation, and governance of the BharatNet project (Phase-II) under the Department of Telecommunications for the period 2017-18 to 2022-23, with status updates through November 2025.

Who it concerns: Union Government, Ministry of Communications, Department of Telecommunications, Bharat Broadband Network Limited (BBNL), and Bharat Sanchar Nigam Limited (BSNL).

What the auditor found

  • CAG found that only 33.20% of service-ready Gram Panchayats (GPs) were operational as of November 2025, despite 96.70% achieving service-ready status.
  • CAG noted that only 17.91% of available bandwidth was utilized, with major telecom providers withdrawing due to service quality concerns.
  • CAG identified that BSNL diverted ₹2,001.43 crore from the project for other purposes under the CPSU-led model, which has since been recouped.
  • CAG found that Detailed Project Reports (DPRs) were prepared based on desktop surveys rather than mandated physical surveys, and projects in Punjab and Bihar were implemented without DPRs.
  • CAG reported that Wi-Fi Access Points were not installed in service-ready GPs for the satellite component, preventing end-user access.
  • CAG noted that the Mean Time to Restore (MTTR) for fibre faults averaged 17 days, with fibre cuts accounting for approximately 48% of non-operational cases.
  • CAG recommended streamlining planning approvals, implementing performance-linked disbursement models, and enhancing service quality through dedicated maintenance teams and AI-based fault detection.

Also in the document

  • CAG stated that while infrastructure coverage reached 96.70% of targeted GPs, operational performance remained significantly low with persistent downtime.
  • CAG highlighted that the decision to merge BBNL with BSNL and implement the Amended BharatNet Program (ABP) reflects an acknowledgement of governance and execution deficiencies noted in the audit.
  • CAG observed that delays in rollout ranged from two to six years across all implementation models, deferring broadband availability in rural areas.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

Comptroller & Auditor General of India (CAG) — audit reports

Audit report · Ref. Report No. 19 of 2026 · 2026

Audit report 2026 · 1.9 MB Open the document On cag.gov.in ↗
Read it here

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.