कौन ज़िम्मेदार? KaunZimmedar

Maharashtra sets 2025–2035 renewable energy policy, cites state targets

The question asked the Ministry of New and Renewable Energy to state whether a roadmap exists to accelerate renewable energy adoption in Maharashtra and to provide details on installed capacity, beneficiaries, and financial assistance under central schemes like PM-Surya Ghar and PM-KUSUM over the last three years.

Asked by Smt. Supriya Sule and Shri Mohite Patil Dhairyasheel Rajsinh; Answered by the Ministry of New and Renewable Energy (Minister Shri Pralhad Joshi).

  • PM-Surya Ghar: Muft Bijli Yojana (PM-SGMBY) launched in Feb 2024 with a target of 1 crore households by 2026-27.
  • PM Surya Sarovar Yojana (PM-SSY) approved with Rs. 5,070 crore Central Financial Assistance for FY 2026-27 to FY 2030-31.
  • Maharashtra Renewable Energy & Energy Storage Policy 2025–2035 targets 52% renewable electricity demand by FY 2030 and 65% by FY 2035.
  • MAHAGENCO has targeted 8 GW renewable energy capacity addition in Maharashtra by 2030.
  • 16,176.13 MW renewable energy capacity installed in Maharashtra in the last three years (14,899.27 MW solar, 914.38 MW wind, 359.28 MW bio, 3.20 MW hydro).
  • Under PM-SGMBY, 10.96 lakh households in Maharashtra benefited with 2,608.12 MW capacity as of 05.08.2026.
  • PM-KUSUM details: 17 MW installed under Component-A; 4,79,135 pumps installed under Component-B; 8,75,000 pumps solarized under Component-C.
  • Funds released in the last three years: Rs. 4,793.09 crore for Rooftop Solar, Rs. 4,924.53 crore for PM-KUSUM, and Rs. 97.81 crore for National Bioenergy Programme.
  • 100% Foreign Direct Investment (FDI) permitted under the automatic route for renewable energy.
  • Energy Storage Systems (ESS) recognized as an integral part of the power system in Electricity Rules amendments (Dec 2022).

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Parliamentary Q&A 12.08.2026
Tap “Open the PDF” above to view this document.
Document details
Official titleRoadmap to Accelerate Adoption of Renewable Energy Projects
Source bodyParliament of India — Questions & Answers (Lok Sabha, starred)
Reference numberLS Q356 (Session 8)
Statusclosed (question)
Year12.0
Closing date
Documents1

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →