कौन ज़िम्मेदार? KaunZimmedar

Passenger Amenities at Badlapur Railway Station in Maharashtra

The MP asked the Ministry of Railways whether improvements are needed for passenger amenities and suburban services at Badlapur station and what steps have been taken. The Ministry provided a detailed statement on existing facilities, ongoing works, connectivity projects, and train services.

Asked by: Shri Balya Mama Suresh Gopinath Mhatre; Answered by: Ministry of Railways (Minister Shri Ashwini Vaishnaw)

  • Existing amenities include 3 high-level platforms (330m), 3 Foot Over Bridges (FOBs), 5 escalators, 1 lift, and a 120m skywalk.
  • Ongoing works include construction of a 100m platform shelter, a new skywalk, 3 additional escalators, 3 additional elevators, a new toilet block, and an additional 6m wide FOB.
  • Sanctioned connectivity projects: Kalyan–Badlapur 3rd & 4th Line (₹1,510 crore), Badlapur–Karjat 3rd & 4th Line (₹1,324 crore), and Kalyan–Murbad New Line (₹836 crore).
  • Badlapur is served by 148 EMU services, including 78 originating/terminating at the station.
  • Central Railway increased car capacity from 12 to 15 cars in 10 EMU services effective 20.07.2026, with 4 of these serving Badlapur.
  • 1,340 stations identified for the Amrit Bharat Station Scheme, including 132 in Maharashtra; 20 stations in Maharashtra are already completed.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Parliamentary Q&A 12.08.2026
Tap “Open the PDF” above to view this document.
Document details
Official titlePassenger Amenities at Badlapur Railway Station in Maharashtra
Source bodyParliament of India — Questions & Answers (Lok Sabha, starred)
Reference numberLS Q341 (Session 8)
Statusclosed (question)
Year12.0
Closing date
Documents1

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →