Parliament Parliament Q&A
95% of scheduled trains operated in Bilaspur, but no data on cancellations or diversions
The question asked the Ministry of Railways to provide details on train cancellations and diversions in the South East Central Railway zone (Bilaspur and Raipur divisions) and the steps taken to ensure smooth passenger train operations.
The government responded by citing infrastructure projects and operational statistics.
Asked and answered by: Asked by Smt. Jyotsna Charandas Mahant; Answered by the Ministry of Railways (Minister Shri Ashwini Vaishnaw).
What the government said
- Approximately 95% of scheduled trains were operated in Bilaspur division during 2025-26.
- Over 98% of scheduled trains were operated in Raipur division during 2025-26.
- 96% of scheduled trains ran on designated routes in Bilaspur division.
- 97% of scheduled trains ran on designated routes in Raipur division.
- 9 recently completed infrastructure projects in South East Central Railway, including Kharsia-Korichhapar New Line and Champa-Jharsuguda 3rd Line.
- 17 ongoing infrastructure projects in South East Central Railway, including Kharsia-Dharamjaygarh New Line and Kharsia-Parmalkasa New Double Line.
- 33,624 Fog Safe Devices available across Indian Railways as of 31.05.2026.
- 36 projects sanctioned for Chhattisgarh state, totaling 2,398 km length and costing ₹48,202 crore.
- About 88% of tracks in South East Central Railway have been upgraded to 110 kmph and above speed potential.
Also in the document
- The answer does not provide a specific count of trains cancelled or diverted in the last year, instead providing the percentage of trains that were operated.
- The answer does not directly address the specific claim about inconvenience due to priority given to coal transportation, but lists maintenance and infrastructure works as reasons for regulation.
- The answer states that Indian Railways operates freight and passenger trains over common infrastructure, which necessitates regulation for maintenance and capacity augmentation.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
Parliament of India — Questions & Answers (Lok Sabha, starred)
Question to govt · Ref. LS Q250 (Session 8) · 5 Aug 2026
Read it here
Discussion
No one has discussed this document yet.