कौन ज़िम्मेदार? KaunZimmedar

PM-SGMBY budget rises to ₹22,000 crore in 2026-27

The question asked the Ministry of New and Renewable Energy to provide details on the financial allocation for the PM-Surya Ghar Muft Bijli Yojana (PM-SGMBY) in Budget 2026-27, installation rates, and the scheme's contribution to manufacturing and energy targets.

Asked by Dr. Shrikant Eknath Shinde and Shri Ravindra Dattaram Waikar; Answered by the Ministry of New and Renewable Energy (Minister Shri Pralhad Joshi).

  • MNRE budget increased from Rs. 25,301.22 Cr (2025-26 Revised) to Rs. 32,914.67 Cr (2026-27 Budget Estimate).
  • PM-SGMBY budget increased from Rs. 17,000 Cr (2025-26 Revised) to Rs. 22,000 Cr (2026-27 Budget Estimate).
  • Installation rate for covering one lakh households reduced from 'few months' to around 6 days.
  • As of 04.08.2026, 77,44,376 applications received with 14.8 GW cumulative installed capacity.
  • Over 50 lakh households benefited with ₹28,024 crore in Central Financial Assistance (CFA).
  • Basic Customs Duty (BCD) waived on sodium antimonate for solar glass and on capital goods for lithium-ion battery manufacturing.
  • Solar power generation capacity of over 14.65 GW added till 31.7.2026, contributing to the 500 GW non-fossil fuel target by 2030.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Parliamentary Q&A 05.08.2026
Tap “Open the PDF” above to view this document.
Document details
Official titleFinancial Allocation for PM-SGMBY
Source bodyParliament of India — Questions & Answers (Lok Sabha, starred)
Reference numberLS Q253 (Session 8)
Statusclosed (question)
Year05.0
Closing date
Documents1

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →