Logistics Efficiency under PMGS-NMP
The question asked the Ministry of Commerce and Industry to state the progress in improving logistics efficiency and reducing costs under the PM GatiShakti National Master Plan (PMGS-NMP), details of infrastructure projects completed in the last three years, and assessments of the impact on trade competitiveness and exports.
Asked by Shri Yogender Chandolia and Dr. Sanjay Jaiswal; Answered by the Ministry of Commerce & Industry (Minister Shri Piyush Goyal).
- Logistics cost in India is estimated at 7.9% of GDP, comparable to advanced economies.
- India’s rank in the World Bank's Logistics Performance Index (LPI) improved to 38th, an advancement of 6 positions.
- 29 States/UTs have formulated Logistics Policies and 32 have granted industry status to the logistics sector.
- 396 infrastructure projects with an estimated cost of ₹18.66 Lakh Crore have been evaluated through the Network Planning Group (NPG).
- Out of 396 evaluated projects, 256 have been sanctioned and 198 are under implementation.
- In the last three years, 1,115 National Highway projects (18,493 km) costing ₹4.75 Lakh Crore were approved, and 32,370 km of NH length was constructed.
- 237 Indian Railways projects (9,703 km) costing approx. ₹1,90,333 Crore were sanctioned in the last three years.
- A study by IIM Bangalore indicates that every one rupee expenditure in National Highways development leads to a ₹3.2 increase in GDP.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Parliamentary Q&A
11.08.2026
Tap “Open the PDF” above to view this document.
Document details
| Official title | Logistics Efficiency under PMGS-NMP |
| Source body | Parliament of India — Questions & Answers (Lok Sabha, starred) |
| Reference number | LS Q327 (Session 8) |
| Status | closed (question) |
| Year | 11.0 |
| Closing date | — |
| Documents | 1 |