Storage capacity at 5.5 GW, 61 GW needed by 2030 for solar targets

The Standing Committee on Energy examined the performance of solar power projects in India to identify implementation challenges and recommend measures to meet the 2030 target of 306 GW.

Who it concerns: Ministry of New and Renewable Energy (implied by context of solar projects and PM schemes), State Discoms, and the general public (specifically households under PM Surya Ghar and farmers under PM-KUSUM).

What the committee found

  • Inadequate storage capacity: Current storage is 5.5 GW against a projected need of 61 GW by 2030; Committee recommended grants for R&D to indigenize storage technology and reduce costs.
  • Domestic manufacturing gaps: While panel capacity is 91 GW/year, India lacks polysilicon manufacturing capacity and remains dependent on imports for ingots/wafers; Committee recommended production-linked incentives for these components.
  • Pending PPAs: Approximately 44 GW of capacity has no signed Power Purchase Agreements; Committee recommended aligning bids with state demand and enforcing discom compliance with renewable consumption obligations.
  • Transmission delays: Delays caused by environment/forest clearances and right-of-way compensation; Committee recommended uniform state compensation guidelines, a dedicated clearance portal, and better coordination.
  • Land acquisition issues: Difficulty in acquiring land for large-scale plants; Committee recommended a single-window clearance mechanism for time-bound resolution.
  • Regional imbalance: North-East, Himalayan, eastern, and island regions contribute only 2.6% of installed capacity; Committee recommended timely release of central financial assistance to promote development in these areas.
  • Lack of rating system: No reliable system exists to rate solar plant performance; Committee recommended completing the draft rating framework for pilot projects.
  • PM Surya Ghar Yojana: Only 16% of the target (16 lakh out of 1 crore households) achieved as of June 2025; Committee cited low consumer awareness as a major cause.
  • PM-KUSUM progress: Slow progress reported (6% for Component-A, 60% for Component-B, 17% for Component-C); Committee recommended improved monitoring and increased financial assistance for solar pumps above 7.5 horsepower.

Also in the document

  • Storage capacity is currently 5.5 GW, significantly below the projected requirement of 61 GW by 2030.
  • There is currently no domestic manufacturing capacity for polysilicon.
  • Approximately 44 GW of solar capacity has not had Power Purchase Agreements signed as of June 2025.
  • PM Surya Ghar Yojana has completed only 16% of its target installations as of June 2025.
  • PM-KUSUM Component-A progress is at only 6%.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

Parliamentary Standing Committee reports (via PRS Legislative Research)

Committee report · Ref. performance-evaluation-of-solar-power-projects

Committee report 0.2 MB Open the document On prsindia.org ↗
Read it here

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.