Parliament Parliament Q&A
1340 stations identified for redevelopment, but no funds or tech details on waterlogging prevention
The question asked for details on funds, technical measures, pumps, coordination with Urban Local Bodies, and digital monitoring systems for waterlogging prevention in Maharashtra and Madhya Pradesh under the Amrit Bharat Station Scheme…
The question asked for details on funds, technical measures, pumps, coordination with Urban Local Bodies, and digital monitoring systems for waterlogging prevention in Maharashtra and Madhya Pradesh under the Amrit Bharat Station Scheme and other central funds. The Ministry of Railways answered.
Asked and answered by: Shri Shrirang Appa Chandu Barne, Shri Naresh Ganpat Mhaske (asked); Ministry of Railways (answered)
What the government said
- More than 1300 culverts cleaned before monsoon
- 24 additional pipe culverts through micro tunnels on suburban sections
- 225 km of track lifting in Mumbai Division
- Over 300 dewatering pumps (12.5 HP to 100 HP) installed
- Joint inspections with Urban Local Bodies before and after desilting
- Water level sensors at critical bridges and low-lying tracks
- Digital rain gauges at specific locations
- 1340 stations identified for redevelopment under Amrit Bharat Station Scheme (80 in Madhya Pradesh, 132 in Maharashtra)
- 19 stations completed in Madhya Pradesh, 20 in Maharashtra
Also in the document
- The answer does not provide specific figures for funds allocated or utilized during the current year for waterlogging prevention.
- The answer does not address the question about advanced digital technology/real-time micro-monitoring systems beyond mentioning digital rain gauges and water level sensors.
- The answer states that 1340 stations have been identified for redevelopment under Amrit Bharat Station Scheme, with 80 in Madhya Pradesh and 132 in Maharashtra, but does not specify how many of these are directly related to waterlogging prevention.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
Parliament of India — Questions & Answers (Lok Sabha, starred)
Question to govt · Ref. LS Q54 (Session 8) · 22 Jul 2026
Read it here
Discussion
No one has discussed this document yet.