Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Parliament Parliament Q&A

Assam sells 10,990 EVs under FAME-II, 88 charging stations operational

The question asked for details on EV sales, charging stations, subsidy distribution, and infrastructure plans in the North-east under the FAME-II scheme, addressed to the Ministry of Heavy Industries.

Asked and answered by: Shri Gaurav Gogoi (asked), Ministry of Heavy Industries (answered)

What the government said

  • 10,990 EVs sold in Assam (2022-23 to 2024-25)
  • 88 operational EV charging stations in Assam
  • 1.29% share of FAME subsidy for North-eastern States
  • 198 EV chargers sanctioned in Northeast Region

Also in the document

  • FAME-II implemented from 01.04.2019 to 31.03.2024
  • No state-wise allocation under FAME-II
  • Modified UDAN–EV convergence framework not mentioned in Modified UDAN Scheme

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

Parliament of India — Questions & Answers (Lok Sabha, starred)

Question to govt · Ref. LS Q122 (Session 8) · 28 Jul 2026

Parliamentary Q&A 28 Jul 2026 · 0.2 MB Open the document On sansad.in ↗
Read it here

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.