This audit examined the implementation and effectiveness of the Jal Jeevan Mission (JJM) in Karnataka for the period 2019-20 to 2023-24, assessing whether the mission met its objective of providing safe drinking water to every rural…
This audit examined the implementation and effectiveness of the Jal Jeevan Mission (JJM) in Karnataka for the period 2019-20 to 2023-24, assessing whether the mission met its objective of providing safe drinking water to every rural household.
Who it concerns: Government of Karnataka, specifically the implementation of the Jal Jeevan Mission (JJM) across seven selected districts.
What the auditor found
- 34% of targeted households (24.52 lakh) did not have Functional Household Tap Connections (FHTCs) as of November 2024.
- State received only ₹11,189 crore against an allocation of ₹24,819.48 crore (45% utilization) from the Centre.
- Community contributions were negligible, with only ₹22.57 crore collected out of an expected ₹1,594.90 crore.
- Fund utilization for water quality monitoring declined from 50% in 2019-20 to 2% in 2023-24.
- None of the 31 district-level or 48 taluk-level laboratories were equipped to test for Arsenic.
- Independent audit testing found water quality met required standards in only 2 of the 28 test-checked villages.
- In one instance, ₹60.41 lakh was spent on a project that was abandoned midway, failing to provide water to 435 households.
- District Water and Sanitation Missions failed to conduct the mandated 12 meetings in 2019-20 and 2023-24.
- CAG noted deficiencies in planning, execution, financial management, water quality assurance, and post-implementation sustainability.
Also in the document
- CAG reported that the State was yet to provide tap connections to 24.52 lakh households (34% of the target) even after the initial mission period ended in March 2024.
- CAG found that independent testing showed water quality met safety standards in only 2 out of 28 villages checked.
- CAG noted that the State failed to utilize 55% of the central funds allocated for the mission, receiving only ₹11,189 crore out of ₹24,819.48 crore.
- CAG identified that no district or taluk level laboratory in the State was equipped to test for Arsenic contamination.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
⚠ Figures not confirmed. Our automated check could not find every number in this summary in the document. Treat the figures with care and check the original.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
This document is in our archive but is not shown on our front pages: a number in the summary could not be found in the document.
The original document
Comptroller & Auditor General of India (CAG) — audit reports
Audit report · Ref. Report No. 12 of 2025 · 2025
Read it here
Discussion
No one has discussed this document yet.