Only 1% of ₹2,043.79 crore community contribution collected for Jal Jeevan Mission
This audit examined the performance and financial management of the Jal Jeevan Mission (JJM) in Maharashtra for the period from August 2019 to March 2024. It assessed whether the scheme achieved its goal of providing functional household tap connections (FHTC) to rural households and how funds were utilized.
Maharashtra State Government, specifically the Water Supply and Sanitation Department, and the Jal Jeevan Mission scheme.
- Only 24.64% of the 51,560 water supply schemes (WSS) were completed, with 75.35% still in progress as of March 2024.
- Total expenditure was ₹26,410.51 crore, which was significantly higher than the initial estimate of ₹13,668.50 crore due to poor planning and scope changes.
- Expenditure increased by ₹9,608.87 crore due to pending bills, additional work, and scope expansion.
- ₹7.62 crore was identified as invalid expenditure.
- Delays in submitting utility certificates and audited accounts affected the timely release of funds from the Central and State governments.
- Only 26.50% of villages (10,677 out of 40,297) were certified as 'Har Ghar Jal' (Every Home Water) at the state level.
- Water quality testing infrastructure was inadequate, with the state laboratory not established and sub-district laboratories lacking accreditation.
- CAG recommended ensuring reliable water sources before approving schemes, converting private/self-funded connections to functional FHTC, and strengthening internal controls to prevent invalid expenditure.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Audit report
2024
Tap “Open the PDF” above to view this document.
Document details
| Official title | Report of the Comptroller and Auditor General of India Performance Report on Jal Jeevan Mission for the period ended March 2024 |
| Source body | Comptroller & Auditor General of India (CAG) — audit reports |
| Reference number | — |
| Status | closed (audit_report) |
| Year | 2024 |
| Closing date | — |
| Documents | 1 |