The Reserve Bank of India (RBI), Bengaluru, is contracting for the design, supply, installation, testing, and commissioning of four Uninterrupted Power Supply (UPS) systems (two 120 kVA and two 100 kVA) in N+1 parallel redundant mode…
The Reserve Bank of India (RBI), Bengaluru, is contracting for the design, supply, installation, testing, and commissioning of four Uninterrupted Power Supply (UPS) systems (two 120 kVA and two 100 kVA) in N+1 parallel redundant mode, including battery banks, at its Main Office Building.
Who can bid: The document does not state specific eligibility criteria such as minimum turnover, years of experience, or required certifications. It only states that bidders must comply with the 'eligibility criteria outlined in the tender document' and that the UPS supplied must comply with technical specifications in Clause 6.0 of Section VI.
Key terms
- E-Tender ID: 2026_RBI_292285_1
- Pre-bid meeting date: September 29, 2026
- Scope: 2 x 120 kVA and 2 x 100 kVA UPS systems in N+1 mode with battery banks
- Maintenance: All-Inclusive Maintenance Contract (CAMC) periodicity to be defined in Clause 21.0 of Section VI
Also in the document
- Vendors unanimously requested an extension of the bid submission deadline, which the Bank advised should be submitted in writing with justification for consideration.
- The document is a set of minutes from a pre-bid meeting and does not contain the actual bid submission deadline, contract value, or security deposit amounts.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
Reserve Bank of India (RBI)
Tender · Ref. 25899 · 1 Oct 2026
Read it here
Questions a citizen might ask
Observations drawn mechanically from the documents — not findings or allegations.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Discussion
No one has discussed this document yet.