Sunday, 8 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Nat’l Highways Infra Dev Corp

Consultancy Services as Authority’s Engineer for Supervision of balance work : (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on EPC Mode. & (ii) Construction of High Altitude Hill road from Doginala TO Gau from KM 0.000 to KM 15.918 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode.

We have not written this document up yet — it appears to be a scanned image that our software cannot read. The original is below, and it is the authority.

How this was written

This document is in our archive but is not shown on our front pages: we have not written it up yet.

How we work · Report an error in this story

The original document

National Highways & Infrastructure Development Corporation (NHIDCL)

Tender · Ref. 2026_NHIDC_904606_1 · 21 Apr 2026

Notice 21 Apr 2026 · scanned image · 1.1 MB Open the document On nhidcl.com ↗
Notice 21 Apr 2026 On nhidcl.com ↗
Corrigendum 1 21 Apr 2026 · scanned image · 0.5 MB Open the document On nhidcl.com ↗
Read it here
Questions a citizen might ask

Observations drawn mechanically from the documents — not findings or allegations.

  • The department changed this document 1 time after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.