Sunday, 8 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Corrections

Report an error

Tell us what is wrong. The original document is the authority, so the most useful report says what the document says and what we got wrong.

Story: Consultancy Services as Authority’s Engineer for Supervision of balance work : (i) Construction of High Altitude Hill road from Tedadege TO Henkaer from KM 0.000 to KM 28.550 in West Siang District of the state of Arunachal Pradesh on EPC Mode. & (ii) Construction of High Altitude Hill road from Doginala TO Gau from KM 0.000 to KM 15.918 in Upper Subansiri District of the state of Arunachal Pradesh on EPC Mode.



We do not ask who you are. We store a scrambled code instead of your internet address, only to stop the form being flooded.