Sunday, 8 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Nat’l Highways Infra Dev Corp

NHIDCL invites bids for 45.645 km high-speed corridor in Meghalaya and Assam

NHIDCL is inviting bids for the development, maintenance, management, and operation of a 45.645 km greenfield high-speed corridor (Package-1) from Mawlyngkhung in Meghalaya to Panchgram in Assam on a Hybrid Annuity basis.

Who can bid: The provided text does not state specific eligibility criteria such as minimum turnover, years of experience, or required certifications. It mentions that bids can be submitted by a 'private entity' or a 'Consortium' (referencing a Joint Bidding Agreement), but no specific qualification thresholds are listed in this excerpt.

Key terms

  • Estimated Project Cost (Excluding GST): Rs 4734.24 Cr
  • Estimated Project Cost (Including GST): Rs 4971.50 Cr
  • Tender Type: Hybrid Annuity Basis
  • Bid Submission Deadline: 16.02.2026 (up to 1500 Hrs. IST)
  • Technical Bid Opening Date: 17.02.2026 (at 1500 hours IST)
  • Bid Security: Must be submitted physically within 5 working days of the Bid Due Date if using demand draft, FDR, or banker's cheque

Also in the document

  • The estimated project cost is approximately Rs 4,734 Crore (excluding GST).
  • Bids must be submitted online only; physical submission of the bid itself is not entertained, though certain security documents must be submitted physically within 5 working days of the deadline.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

⚠ Figures not confirmed. Our automated check could not find every number in this summary in the document. Treat the figures with care and check the original.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

This document is in our archive but is not shown on our front pages: a number in the summary could not be found in the document.

How we work · Report an error in this story

The original document

National Highways & Infrastructure Development Corporation (NHIDCL)

Tender · 2 Jan 2026

Notice 2 Jan 2026 · 0.1 MB Open the document On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Notice 2 Jan 2026 On nhidcl.com ↗
Corrigendum 1 2 Jan 2026 · 2.4 MB Open the document On nhidcl.com ↗
Corrigendum 2 2 Jan 2026 · 10.0 MB Open the document On nhidcl.com ↗
Corrigendum 3 2 Jan 2026 · scanned image · 0.5 MB Open the document On nhidcl.com ↗
Corrigendum 4 2 Jan 2026 · scanned image · 0.4 MB Open the document On nhidcl.com ↗
Corrigendum 5 2 Jan 2026 · scanned image · 0.6 MB Open the document On nhidcl.com ↗
Corrigendum 6 2 Jan 2026 · scanned image · 0.5 MB Open the document On nhidcl.com ↗
Corrigendum 7 2 Jan 2026 · scanned image · 1.7 MB Open the document On nhidcl.com ↗
Corrigendum 8 2 Jan 2026 · scanned image · 0.2 MB Open the document On nhidcl.com ↗
Corrigendum 9 2 Jan 2026 · scanned image · 0.4 MB Open the document On nhidcl.com ↗
Corrigendum 10 2 Jan 2026 · scanned image · 0.7 MB Open the document On nhidcl.com ↗
Corrigendum 11 2 Jan 2026 · scanned image · 0.5 MB Open the document On nhidcl.com ↗
Corrigendum 12 2 Jan 2026 · scanned image · 0.2 MB Open the document On nhidcl.com ↗
Corrigendum 13 2 Jan 2026 · scanned image · 0.2 MB Open the document On nhidcl.com ↗
Corrigendum 14 2 Jan 2026 · scanned image · 0.3 MB Open the document On nhidcl.com ↗
Corrigendum 15 2 Jan 2026 · scanned image · 0.2 MB Open the document On nhidcl.com ↗
Read it here
Questions a citizen might ask

Observations drawn mechanically from the documents — not findings or allegations.

  • The department changed this document 15 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.