Balance Works for: (i) Construction of 2-Lane Specification Road with Paved Shoulders as Realignment (Greenfield Alignment) of Existing Stretch between Legship and Gyalshing of NH-510 (Design Chainage Km 58+840 to Km 75+000) under SARDP-NE Phase “A” on EPC Mode in the State of Sikkim (Package-V). (ii) Construction of 2-Lane Specification Road with Paved Shoulder as Realignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210) under SARDP-NE Phase ”A” on EPC Mode in the State of Sikkim-(Package- VI)”
No plain-language summary yet for this document — it may be a scanned image. The original is below.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Notice
2026-07-21
scanned
Document details
| Official title | Balance Works for: (i) Construction of 2-Lane Specification Road with Paved Shoulders as Realignment (Greenfield Alignment) of Existing Stretch between Legship and Gyalshing of NH-510 (Design Chainage Km 58+840 to Km 75+000) under SARDP-NE Phase “A” on EPC Mode in the State of Sikkim (Package-V). (ii) Construction of 2-Lane Specification Road with Paved Shoulder as Realignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210) under SARDP-NE Phase ”A” on EPC Mode in the State of Sikkim-(Package- VI)” |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | 2026_NHIDC_918372_1 |
| Status | None (current) |
| Year | 2026 |
| Closing date | 24-09-2026 15:00:00 |
| Documents | 1 |