Corrections
Report an error
Tell us what is wrong. The original document is the authority, so the most useful report says what the document says and what we got wrong.
Story: Balance Works for: (i) Construction of 2-Lane Specification Road with Paved Shoulders as Realignment (Greenfield Alignment) of Existing Stretch between Legship and Gyalshing of NH-510 (Design Chainage Km 58+840 to Km 75+000) under SARDP-NE Phase “A” on EPC Mode in the State of Sikkim (Package-V). (ii) Construction of 2-Lane Specification Road with Paved Shoulder as Realignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210) under SARDP-NE Phase ”A” on EPC Mode in the State of Sikkim-(Package- VI)”