Environment Environment Ministry · PARIVESH
Amendment to EC granted for Pune project near military zone
This document grants an amendment to the Environmental Clearance for a proposed residential and commercial project (township/area development) located at Village Bhukum, Taluka Mulshi, District Pune, Maharashtra.
Who it concerns: The project proponent is M/s. Enerrgia Skyi Ventures, and the clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Maharashtra.
Conditions and facts
- Clearance Status: Amendment in Environmental Clearance granted on 27/07/2026.
- Original EC Date: 08/06/2026.
- EC Identification No: EC26B3812MH5249325A.
- Project Category: B1 (Townships/ Area Development Projects / Rehabilitation Centres).
- Condition: Proponent must obtain planning approvals and NOCs, ensuring conformity with local planning rules and Supreme Court orders regarding green area.
- Condition: Building height (including lightning arrester and water tank) must be restricted as per Ministry of Defence (MoD) NOC.
- Condition: Project must be a plastic-free zone.
- Condition: Treated sewage must meet National Green Tribunal standards (30.04.2019 order), and construction water must not be drinking water.
- Condition: Construction and demolition waste must be managed per 2016 Rules.
- Condition: Electric vehicle charging facilities must be provided per Maharashtra EV Policy 2025.
- Condition: Minimum 5% energy saving via non-conventional energy sources is required.
Also in the document
- The project is subject to height restrictions due to a Ministry of Defence (MoD) NOC, indicating proximity to a sensitive military or aviation zone.
- The amendment log (Annexure 2) is listed as 'NA' in the provided text, meaning the specific details of what changed from the original clearance are not described in this document.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
PARIVESH — Environmental & Forest Clearances (MoEFCC)
Clearance · Ref. SIA/MH/INFRA2/581291/2026 · 8 Jun 2026
Read it here
Discussion
No one has discussed this document yet.