RBI to replace M.S glazing with uPVC windows at Kolkata office by July 2026
The Reserve Bank of India is contracting for the replacement of old Mild Steel (M.S) fixed glazing with new uPVC glazing cum shutter system windows on the east and north faces at the 2nd floor, along with allied civil works at its Main Office Building in Kolkata, West Bengal.
Not stated in the document
- Estimated/contract value: Not stated
- EMD/security amount: Not stated
- Tender type: Open (as per the reference to e-tender on RBI and MSTC websites)
- Bid submission deadline: July 28, 2026
- Bid validity: Not stated
- Contract duration: Not stated
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Corrigendum 1
2026-07-27
Tap “Open the PDF” above to view this document.
Document details
| Official title | Extension of Last Date of Submission - Replacement of the old Mild Steel (M.S) fixed glazing on the east and north face with new uPVC glazing cum shutter system window at the 2nd floor, along with allied civil works at the Bank's Main Office Building, Kolkata, West Bengal |
| Source body | Reserve Bank of India (RBI) |
| Reference number | 25571 |
| Status | active (current) |
| Year | 2026 |
| Closing date | 2026-07-28 |
| Documents | 1 · changed 1× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?