Friday, 30 October 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Markets Reserve Bank of India

RBI Raipur to spend ₹357.88 lakh on 90-day office renovation

The Reserve Bank of India (RBI), Raipur Regional Office, is contracting for the interior renovation of the B block 1st floor, including civil, MEP, HVAC, electrical, and allied works.

₹357.88 lakhEstimated cost: ₹357.88 lakh

Who can bid: Bidders must have a minimum yearly turnover of 100% of the estimated cost (₹357.88 lakh) during each of the last three financial years. They must provide a solvency certificate from their banker for an amount equal to the estimated cost. Bidders must have completed similar works with a value of at least 40% of the estimated cost within the last 7 years (cut-off date September 30, 2019). A 'full-fledged service setup' at Raipur is required, as per Clause 4.5 of the tender document.

Key terms

  • Estimated cost: ₹357.88 lakh
  • Contract duration: 90 days
  • Tender Type: e-Tender (No: RBI/RRO/EST/26-27/1)

Also in the document

  • The layout is fixed and cannot be changed.
  • Quantities in the Bill of Quantities (BOQ) may change as the General Finished Condition (GFC) drawing supersedes the BOQ.
  • Work must be completed within 90 days, with the site available for day and night work.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

Reserve Bank of India (RBI)

Tender · Ref. 26070 · 29 Oct 2026

Corrigendum 1 29 Oct 2026 · 0.3 MB Open the document On rbidocs.rbi.org.in ↗
Read it here
Questions a citizen might ask

Observations drawn mechanically from the documents — not findings or allegations.

  • The department changed this document 1 time after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

Discussion