Nat’l Highways Infra Dev Corp
NHIDCL requires ₹3.46 lakh e-bank guarantee for landslide monitoring bid
NHIDCL is inviting bids for the supply and installation of instruments and web-based monitoring for the PagalNallah Landslide site on NH-07 in Chamoli District, Uttarakhand.
500 croreThe bid security must be submitted strictly as an e-Bank Guarantee from a scheduled commercial bank with a net wort…
Who can bid: Bidders must have an average annual turnover of Rs. 1.73 Cr during the last 3 years. They must also have completed work of similar nature in the last 5 years, meeting one of the following: a single work of Rs. 0.86 Cr, two similar works of Rs. 0.60 Cr each, or three similar works of Rs. 0.43 Cr each. Bidders must be registered on the e-procurement portal (eorocure.gov.in) with a valid registration at the time of bid submission.
Key terms
- Estimated Cost: Rs. 1.73 Cr (Excl. GST)
- Bid Security: Rs. 3.46 Lakh (e-Bank Guarantee only)
- Contract Duration: 12 Months
- Bid Validity: 120 Days
- Tender Type: e-tendering (Open)
- Bid Submission Deadline: 15-09-2025 (15:00 Hrs.)
- Bid Document Cost: Rs. 11,800 (Non-refundable)
Also in the document
- The bid security must be submitted strictly as an e-Bank Guarantee from a scheduled commercial bank with a net worth of at least Rs. 500 crore; other forms are not acceptable.
- The authorized signatory holding Power of Attorney must be the same person as the Digital Signatory, otherwise the bid will be considered non-responsive.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
National Highways & Infrastructure Development Corporation (NHIDCL)
Tender · 25 Aug 2025
Read it here
Questions a citizen might ask
Observations drawn mechanically from the documents — not findings or allegations.
- The department changed this document 4 times after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?