NHIDCL extends bid deadline to 29/09/2025 for ₹98.05 crore Jammu-Kashmir road project

NHIDCL is inviting bids for the construction of leftover work (2-lane with paved shoulder) on a 4.037 km stretch of NH-244 in Jammu & Kashmir under an Engineering, Procurement, and Construction (EPC) contract.

The document states that bids are invited from 'eligible contractors' but does not specify the detailed eligibility criteria such as minimum turnover, years of experience, or required certifications in the provided text.

  • Estimated Cost: Rs. 98.05 Crore (exclusive of GST)
  • Bid Security: Rs. 0.99 Crore
  • Completion Period: 2 years
  • Maintenance Period: 5 years
  • Tender Type: EPC Mode
  • Bid Submission Deadline: 29/09/2025 (as per Corrigendum 02)
  • Bid Opening Date: 30/09/2025 (as per Corrigendum 02)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2025-08-07
Tap “Open the PDF” above to view this document.
Notice 2025-08-07
Notice 2025-08-07
Notice 2025-08-07
Notice 2025-08-07
Corrigendum 1 2025-08-07 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 2025-08-07
Tap “Open the PDF” above to view this document.
Document details
Official titleConstruction of left-over work (2-lane with paved shoulder) of the road stretch of Pkg-III at Kandni Village from design Ch. 0+000 to Ch. 4+037 (Ch. 70+900 to Ch. 74+650 of NH-244) in 4.037 km length on Khellani-Kishtwar-Chhatroo section of NH-244 in UT of Jammu & Kashmir on EPC Mode
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2025
Closing date22-09-2025
Documents7 · changed 2× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say