कौन ज़िम्मेदार? KaunZimmedar

NHIDCL awards erosion control contract for Tripura highway flood repairs

The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is contracting restoration works for erosion control and slope protection on damaged stretches of NH-08 from Udaipur to Sabroom and Udaipur to Melaghar road in Tripura, following August 2024 floods, based on a technical consultant's report.

Bidders must have a minimum average annual turnover of Rs. 2864.87 Lakh over the last 5 years for similar work.

  • Estimated contract cost: Rs. 57.30 Lacs
  • EMD/security amount: Rs. 57.30 Lacs
  • Tender type: Open (e-tendering)
  • Bid submission deadline: 01-10-2025 (original), extended to 13-10-2025 (Corrigendum 2)
  • Bid validity: 120 days from bid due date
  • Contract duration: Not stated

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2025-09-10
Tap “Open the PDF” above to view this document.
Notice 2025-09-10
Corrigendum 1 2025-09-10
Tap “Open the PDF” above to view this document.
Corrigendum 2 2025-09-10
Tap “Open the PDF” above to view this document.
Document details
Official titleRestoration works under Special Repairs through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Udaipur to Sabroom and on Udaipur to Melaghar road (Spur NH-08), due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis.
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2025
Closing date01-10-2025
Documents4 · changed 2× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →