Short term maintenance contract of NH-08 between ch.343+000 to ch.397+000 (road maintenance work between ch.375+000 to ch.397+000, i.e. total 13.5km in different stretches & road safety work in total 54 km i.e., from Ch. 343+000 to Ch. 397+000 in non DLP stretches) in the State of Tripura in the year 2025-26 on percentage basis and work order basis
What is this tender for?
The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is seeking bids for short-term maintenance work on National Highway 08 (NH-08) in Tripura, covering 13.5 km of road maintenance and 54 km of road safety work between specific chainages, to be performed on a percentage basis and work order basis for the year 2025-26.
Who can bid / win?
Bidders must have an average annual turnover of at least Rs. 785.24 lakh over the last 3 years, or experience in completing at least one highway/road maintenance contract of Rs. 392.62 lakh (50% of the estimated cost), or two contracts of Rs. 274.83 lakh each (35% each), or three contracts of Rs. 196.31 lakh each (25% each) over the last 5 years. Bidders must be registered on the e-procurement portal (eorocure.gov.in) with a valid registration at the time of bid submission.
Key terms
- Estimated cost: Rs. 785.24 Lacs (inclusive of GST)
- Bid document cost: Rs. 11,800/- (non-refundable)
- Bid security: Rs. 15.71 Lacs
- Bid submission deadline: 10-10-2025
- Bid validity: 120 days from bid due date
- Contract duration: Not stated in the document
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: archive) |
| Year | 2025 |
| Closing date | 10-10-2025 |
| Documents | 3 · changed 1× after publishing |
Highlights & Points worth asking
These are factual observations drawn mechanically from the documents below — not findings, opinions, or allegations of wrongdoing. Verify each against the linked original.
What we observed
- The department changed this document 1 time after first publishing it.
Points a citizen might reasonably ask
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →