Markets Reserve Bank of India
RBI tender mandates specific brand for bird-proof netting at Thiruvananthapuram quarters
The Reserve Bank of India (Thiruvananthapuram) is contracting for the provision and installation of a bird-proof netting system on the external areas of all residential blocks at its Staff Quarters in Nanthancode, Thiruvananthapuram.
Who can bid: The document does not state specific eligibility criteria such as minimum turnover, years of experience, or required certifications. It only notes that the successful bidder must submit a Performance Bank Guarantee and that the EMD is not required.
Key terms
- EMD: Not required
- Security: Performance Bank Guarantee required from successful bidder
- Material Specification: HDPE net, mesh size 30mm x 30mm, 1.5mm twine/strand thickness, Garware technical fibres Ltd. or approved equivalent
- Scope: All residential blocks except part of A block (already done) and dead walls without openings
Also in the document
- The tender specifies a particular brand (Garware technical fibres Ltd.) or 'approved equivalent' for the netting material, requiring submission of manufacturer's data sheets and samples for approval before installation.
- The contractor is solely responsible for the safety of all personnel and must provide all Personal Protective Equipment (PPE) and staging arrangements at their own cost.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
Reserve Bank of India (RBI)
Tender · Ref. 26004 · 19 Oct 2026
Read it here
Questions a citizen might ask
Observations drawn mechanically from the documents — not findings or allegations.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Discussion
No one has discussed this document yet.