NHIDCL to spend ₹971.10 lakh on 12-month NH-244 repair in J&K
The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is contracting for the restoration and repair of a section of National Highway 244 (NH-244) from Sinthantop to Vailoo (Km 193.000 to Km 235.000) in the Union…
971.10 lakhEstimated cost: Rs. 971.10 lakh
The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is contracting for the restoration and repair of a section of National Highway 244 (NH-244) from Sinthantop to Vailoo (Km 193.000 to Km 235.000) in the Union Territory of Jammu & Kashmir, including landslide clearance, boulder removal, side drain and culvert work, construction of retaining walls and boundary walls, and laying of Dense Bituminous Macadam and Bituminous Concrete.
Who can bid: Bidders must have a minimum average annual turnover of Rs. 485.55 lakh from a single work of similar nature in the last 5 years, or two similar works each of Rs. 339.89 lakh, or three similar works each of Rs. 242.78 lakh in the last 3 years. Bidders must be registered on the e-procurement portal (eprocure.gov.in) and the Bidder Information Management System (BIMS) portal with valid registration at the time of bid submission.
Key terms
- Estimated cost: Rs. 971.10 lakh
- Bid security: Rs. 9.71 lakh
- Tender type: Open
- Bid submission deadline: 2025-10-29
- Bid validity: 120 days
- Contract duration: 12 months
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
National Highways & Infrastructure Development Corporation (NHIDCL)
Tender · 15 Oct 2025
Read it here
Questions a citizen might ask
Observations drawn mechanically from the documents — not findings or allegations.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Discussion
No one has discussed this document yet.