Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode
Plain-language summary (AI-generated) — a quick read so you don't have to open the full PDF. May contain errors; the original document below is authoritative.
What is this tender for?
NHIDCL is contracting the construction of remaining tunnel work at Km 83 and a major bridge between Km 82+675 and Km 82+925 on NH-244 in J&K UT under an EPC (Engineering, Procurement, Construction) contract.
Who can bid / win?
Not stated in the document
Key terms
- Estimated cost: Rs 49.11 Crore
- Bid submission deadline: 30/10/2025
- Bid validity: Not stated
- Contract duration: 2 years (completion), 10 years (maintenance)
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: archive) |
| Year | 2025 |
| Closing date | 30-10-2025 |
| Documents | 6 |
Highlights & Points worth asking
Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.
No automated observations for this document. Read the documents below directly.
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Notice
2025-10-01
nit_balance_work_km_83rd_tunnel.pdf
Tap “Open the PDF” above to view this document.
Notice
2025-10-01
RFP
Notice
2025-10-01
DCA
Notice
2025-10-01
Schedules
Notice
2025-10-01
Drawings
Notice
2025-10-01
Annulment Notice
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →