Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode

NHIDCL closed 2025
Plain-language summary (AI-generated) — a quick read so you don't have to open the full PDF. May contain errors; the original document below is authoritative.

What is this tender for?

NHIDCL is contracting the construction of remaining tunnel work at Km 83 and a major bridge between Km 82+675 and Km 82+925 on NH-244 in J&K UT under an EPC (Engineering, Procurement, Construction) contract.

Who can bid / win?

Not stated in the document

Key terms

  • Estimated cost: Rs 49.11 Crore
  • Bid submission deadline: 30/10/2025
  • Bid validity: Not stated
  • Contract duration: 2 years (completion), 10 years (maintenance)
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (section: archive)
Year2025
Closing date30-10-2025
Documents6

Highlights & Points worth asking

Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.

No automated observations for this document. Read the documents below directly.

📄 Draft an RTI to ask what the documents don't say

Documents

The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.

Notice 2025-10-01 nit_balance_work_km_83rd_tunnel.pdf
Tap “Open the PDF” above to view this document.
Notice 2025-10-01 RFP
Notice 2025-10-01 DCA
Notice 2025-10-01 Schedules
Notice 2025-10-01 Drawings
Notice 2025-10-01 Annulment Notice

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →