कौन ज़िम्मेदार? KaunZimmedar

NHIDCL to spend ₹90.87 crore on 22.340 km road upgrade in Manipur

National Highways & Infrastructure Development Corporation Limited (NHIDCL) is contracting for the balance work of improving an existing 22.340 Km section of NH-129A in Manipur to a 2-lane road with hard shoulders, using an Engineering, Procurement, and Construction (EPC) model.

The document invites bids from 'eligible contractors' but does not specify minimum turnover, years of experience, required certifications, or entity type requirements in this text.

  • Estimated Cost: Rs. 90,86,86,113/- (approx. 90.87 Cr.) excluding GST
  • Security: Rs. 60 Cr (Maintenance Security)
  • Tender Type: EPC Contract via CPPP portal
  • Bid Submission Deadline: 25/11/2025 (upto 1500 Hrs. IST)
  • Bid Opening Date: 26/11/2025 (at 1630 hours IST)
  • Contract Duration: 12 Months Construction Period
  • Maintenance Period: 60 Months

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2025-10-23
Tap “Open the PDF” above to view this document.
Notice 2025-10-23
Document details
Official titleBalance work of Improvement of existing road to 2-laning with Hard Shoulders of Maram Peren section Package- IA on NH-129A in the State of Manipur on EPC mode.
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2025
Closing date25-11-2025
Documents2

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →