कौन ज़िम्मेदार? KaunZimmedar

NHIDCL extends bid deadline thrice for Manipur road project to 27 January 2026

NHIDCL is inviting bids for the balance work of improving an existing 22.340 Km section of NH-129A in Manipur to a 2-lane road with hard shoulders, to be executed on an Engineering, Procurement and Construction (EPC) mode.

The document states that bids are invited from 'eligible contractors' but does not specify minimum turnover, years of experience, required certifications, or entity type requirements in the provided text.

  • Estimated Cost: Rs. 90,86,86,113/- (approx. 90.87 Cr.) excluding GST
  • Construction Period: 12 Months
  • Security Maintenance Period: 60 Months
  • Bid Validity: 120 days from BID Due Date
  • Tender Type: EPC Contract via CPPP portal (eprocure.gov.in)
  • Final Bid Due Date: 27/01/2026 (as per Corrigendum 2)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2025-10-23
Tap “Open the PDF” above to view this document.
Notice 2025-10-23
Notice 2025-10-23
Corrigendum 1 2025-10-23
Tap “Open the PDF” above to view this document.
Corrigendum 2 2025-10-23
Tap “Open the PDF” above to view this document.
Document details
Official titleImprovement of existing road to 2-laning with Hard Shoulders of Maram - Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0+000 Km to Km 22.340 Km on NH-129A in the State of Manipur on EPC mode
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2025
Closing date25-11-2025
Documents5 · changed 2× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →