कौन ज़िम्मेदार? KaunZimmedar

NHIDCL invites bids for alternate highway feasibility study in West Bengal

NHIDCL, a government entity under the Ministry of Road, Transport and Highways, is contracting consultancy services to conduct a feasibility study, prepare a Detailed Project Report, and handle pre-construction activities for an alternate highway along NH-110 from Siliguri to Darjeeling in West Bengal.

Consultants must meet guidelines in the Public Procurement (Preference to Make in India) Order, 2017 (amended on 16.09.2020). They must register and enlist on the MoRTH portal 'INFRACON' and form a team with a unique Infracon Team ID. No specific turnover, experience, or certification thresholds are stated in the document.

  • Estimated/contract value: not stated
  • EMD/security amount: not stated
  • Tender type: open (as per invitation to all eligible consultants)
  • Bid submission deadline: 2025-12-15
  • Bid validity: 120 days from bid due date
  • Contract duration: not stated

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2025-10-31
Tap “Open the PDF” above to view this document.
Notice 2025-10-31
Corrigendum 1 2025-10-31 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 2025-10-31 scanned
Tap “Open the PDF” above to view this document.
Document details
Official titleConsultancy services for carrying out feasibility study and preparation of Detailed Project Report and Pre-construction activities for alternate highway of existing highway (NH-110) from Siliguri to Darjeeling in the state of West Bengal
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2025
Closing date15-12-2025
Documents4 · changed 2× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →