NHIDCL sets ₹29.38 lakh bid security for ₹1468.94 lakh Assam highway maintenance contract
NHIDCL is inviting bids for a 12-month Short Term Maintenance Contract (STMC) to repair and maintain a 15.447 km section of National Highway 15 (formerly NH-37) in Assam, covering routine maintenance of carriageways, bridges, drains, and signage.
Bidders must have an Average Annual Turnover of at least Rs. 1468.94 Lakh during the last 3 years. They must also have experience in similar works during the last 5 years, meeting one of the following: a single work of Rs. 734.47 Lakh, two similar works of Rs. 514.13 Lakh each, or three similar works of Rs. 367.24 Lakh each. Bidders must be registered on the e-procurement portal (eprocure.gov.in) with a valid registration at the time of bid submission.
- Estimated Bid Cost: Rs. 1468.94 Lakh (Inclusive of GST & Cess)
- Bid Security: Rs. 29.38 Lakh (via e-Bank Guarantee, NEFT, or RTGS only)
- Contract Duration: 12 months
- Tender Type: Single Percentage Rate Bids via e-tendering
- Bid Submission Deadline: 27.12.2025 (17:00 Hrs.)
- Bid Validity: 120 days from submission deadline
- Bid Document Cost: Rs. 11,800 (Non-refundable)
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Document details
| Official title | Short Term Maintenance Contract (STMC) Work for Repair/Maintenance of Realignment of old NH-37 (new NH-15) from Bogibeel junction at Km 581.700 to Km 597.147 (Total Length 15.447 km) in the state of Assam in FY-25-26 |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (archive) |
| Year | 2025 |
| Closing date | 27-12-2025 |
| Documents | 3 · changed 1× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?