NHIDCL extends NH-08 restoration bid deadline to 9 Jan 2026, sole bidders only
NHIDCL is inviting bids for restoration works, including erosion control and slope protection, on NH-08 (Udaipur to Sabroom) and the Udaipur to Melaghar spur road in Tripura to repair damage caused by the August 2024 floods.
Bidders must be sole entities (Joint Ventures are not allowed). They must have an average annual turnover of at least Rs. 2864.87 Lakh during the last 5 years and experience in similar work during the last 5 years as per Clause 4.3 A (b). Bidders must be registered on the e-procurement portal and provide a self-certification for Local Content requirements.
- Estimated Contract Cost: Rs. 2864.87 Lacs
- Bid Security/EMD: Rs. 57.30 Lacs
- Contract Duration: 12 months
- Tender Type: Single Percentage Rate Bids via e-tendering
- Bid Validity: 120 days from the Bid Due Date
- Bid Document Cost: Rs. 11,800 (Non-refundable)
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Document details
| Official title | Restoration works under Special Repairs through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Udaipur to Sabroom and on Udaipur to Melaghar road (Spur NH-08), due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis (2nd call) |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (archive) |
| Year | 2025 |
| Closing date | 30-12-2025 |
| Documents | 3 · changed 1× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?