कौन ज़िम्मेदार? KaunZimmedar

NHIDCL bans JVs in ₹955.98-lac Tripura highway widening tender

NHIDCL is inviting bids for the widening of a 2.300 km section of National Highway-08 (Agartala to Udaipur) in Tripura to a 2-lane plus passing lane configuration, along with routine maintenance of the section, on a percentage and work order basis.

Bidders must be sole entities (Joint Ventures are not allowed). They must have an average annual turnover of at least Rs. 955.98 Lakh during the last 3 years. They must have experience in successfully completing or substantially completing highway/road construction or maintenance works in the last 5 years, meeting one of the following criteria: a single work of Rs. 477.99 Lakh, two similar works of Rs. 334.59 Lakh each, or three similar works of Rs. 239.00 Lakh each. Bidders must be registered on the e-procurement portal (eorocure.gov.in) with a valid registration at the time of bid submission.

  • Estimated Cost: Rs. 955.98 Lacs (inclusive of GST)
  • Bid Security/EMD: Rs. 19.12 Lacs
  • Contract Duration: 105 months
  • Tender Type: Single Percentage Rate Bids via e-tendering
  • Bid Submission Deadline: 05-01-2026 (up to 17.00 Hrs. IST)
  • Bid Validity: 120 days from the Bid Due Date
  • Bid Document Cost: Rs. 11,800 (Non-Refundable)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2025-12-15
Tap “Open the PDF” above to view this document.
Notice 2025-12-15
Corrigendum 1 2025-12-15
Tap “Open the PDF” above to view this document.
Corrigendum 2 2025-12-15
Tap “Open the PDF” above to view this document.
Document details
Official titleShort Term Maintenance Contract (STMC) for widening to 2L+PS from km 22.600 to km 24.900 at Sepahijala Wildlife Sanctuary (Total length 2.300 km) on road Agartala to Udaipur (NH-08) in the State of Tripura in the year 2025-26 on percentage basis and work order basis.
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2025
Closing date05-01-2026
Documents4 · changed 2× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →