NHIDCL bans joint ventures, allows only sole bidders for ₹4.09 crore Meghalaya road project
National Highways Infrastructure Development Corporation Limited (NHIDCL) is inviting bids for the construction of Gabion type Breast Walls at various locations on the Ranikor Moheshkhola Baghmara road (SH-04) in Meghalaya.
₹4.10 crEstimated Cost: Rs. 4,09,94,656/- (Inclusive of all taxes & excluding GST)
Who can bid: Bidders must be sole entities (Joint Ventures are not allowed). They must have an average annual turnover of at least Rs. 409.95 lac over the last 3 years. Additionally, they must have experience in highway/road construction or maintenance works of similar nature during the last 5 years, meeting one of the following criteria: a single similar work of at least Rs. 204.97 lac, two similar works each of at least Rs. 143.48 lac, or three similar works each of at least Rs. 102.49 lac. Bidders must also register on the e-procurement portal and provide a self-certification for Local Content requirements.
Key terms
- Estimated Cost: Rs. 4,09,94,656/- (Inclusive of all taxes & excluding GST)
- Bid Security/EMD: Rs. 8.20 lacs
- Tender Type: Item Rate Contract via e-tendering
- Bid Submission Deadline: 12-01-2026 (17:00 Hrs)
- Bid Validity: 120 Days from the Bid Due Date
- Contract Duration: 03 Months (Construction) + 05 Years (Defect Liability Period)
Also in the document
- Joint Ventures (JV) are explicitly not allowed; only sole bidders are permitted.
- Bidders must submit a self-certification for Local Content requirements ('Class-I' or 'Class-II Local Supplier') or be treated as a 'Non-Local Supplier'.
- The bid must be signed by the authorized signatory holding Power of Attorney, who must also be the Digital Signatory; otherwise, the bid is considered non-responsive.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
National Highways & Infrastructure Development Corporation (NHIDCL)
Tender · 23 Dec 2025
Read it here
Questions a citizen might ask
Observations drawn mechanically from the documents — not findings or allegations.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?