Construction of Gabion type Breast Wall at different locations of Ranikor Moheshkhola Ba ghmara road (SH-04) from Km 30.000 (Nongjri) to Km 129.385 (Baghmara) in the State of Meghalaya in FY 2025-26.
What is this tender for?
The National Highways & Infrastructure Development Corporation Ltd. (a Government of India undertaking) is contracting the construction of Gabion type Breast Walls along SH-04 road in Meghalaya, from Km 30.000 (Nongjri) to Km 129.385 (Baghmara), for FY 2025-26 on an item rate basis.
Who can bid / win?
Bidders must have an average annual turnover of at least Rs. 409.95 lakhs over the last 3 years, and must have completed at least one similar highway/road construction work of Rs. 204.97 lakhs (minimum 50% of estimated cost) or two works of Rs. 143.48 lakhs each (minimum 35%) or three works of Rs. 102.49 lakhs each (minimum 25%) within the last 5 years. Bidders must be registered on the e-procurement portal (eprocure.gov.in) with a valid registration at the time of bid submission.
Key terms
- Estimated cost: Rs. 4,09,94,656/- (inclusive of all taxes & excluding GST)
- Bid documents cost: Rs. 11,800/- (non-refundable)
- Bid security: Rs. 8.20 lakhs
- Bid submission deadline: 2026-01-12
- Bid validity: 120 days from bid due date
- Contract duration: 3 months (construction) + 5 years (defect liability period)
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: archive) |
| Year | 2025 |
| Closing date | 12-01-2026 |
| Documents | 3 · changed 1× after publishing |
Highlights & Points worth asking
These are factual observations drawn mechanically from the documents below — not findings, opinions, or allegations of wrongdoing. Verify each against the linked original.
What we observed
- The department changed this document 1 time after first publishing it.
Points a citizen might reasonably ask
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →