Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Dehradun–Kashipur-Nainital in the State of Uttarakhand
What is this tender for?
NHIDCL (a government-owned company under the Ministry of Road, Transport and Highways) is seeking consultancy services to prepare a Detailed Project Report and conduct pre-construction activities for a road project in Uttarakhand, involving greenfield alignment or widening of an existing road to 2 lanes with paved shoulders, including mitigation measures for sinking/sliding zones along the Dehradun–Kashipur-Nainital route.
Who can bid / win?
Consultants must meet the guidelines in the Public Procurement (Preference to Make in India) Order, 2017 (amended on 16.09.2020). They must register and enlist on the MoRTH portal 'INFRACON' and form a team with an Infracon Team ID. No specific turnover, experience, or certification thresholds are stated in the document.
Key terms
- Estimated/contract value: not stated
- EMD/security amount: not stated
- Tender type: open (as per invitation to eligible consultants)
- Bid submission deadline: 2026-02-05
- Bid validity: 120 days from bid due date
- Contract duration: not stated
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: archive) |
| Year | 2025 |
| Closing date | 22-01-2026 |
| Documents | 4 · changed 2× after publishing |
Highlights & Points worth asking
These are factual observations drawn mechanically from the documents below — not findings, opinions, or allegations of wrongdoing. Verify each against the linked original.
What we observed
- The department changed this document 2 times after first publishing it.
Points a citizen might reasonably ask
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →