EPC Contractor to bear full risk and cost of NH-4 rectification works

NHIDCL is inviting bids for short-term and permanent rectification works of damaged stretches on NH-4 (Km 242.00 to Km 298.00) in the Andaman & Nicobar Islands, along with balance works of the project, to be executed at the risk and cost of the existing EPC Contractor.

Bidders must be experienced Road/Bridge Contractors/firms/organizations. They must have an average annual turnover of not less than Rs. 40 Lakh (40,00,000) during the last 5 years and have completed one similar work of similar nature during the last 5 years. Firms declared non-performing or blacklisted/debarred by MoRTH/NHAI/NHIDCL are excluded. The existing EPC Contractor, including its sister concerns, associates, affiliates, parent company, subsidiaries, or any entity with common ownership/control/management, is not eligible to participate individually or as part of a Joint Venture/Consortium/Sub-contractor. MSME registered firms are eligible for exemption from bid document costs upon producing documentary evidence, but no other criteria are diluted.

  • Estimated Civil Cost: Rs. 56,11,83,479 (excluding 18% GST)
  • Tender Security: Rs. 55,18,21,450 (4% of total contract value)
  • Bid Document Cost: Rs. 11,800.00 (Non-refundable)
  • Tender Type: National Competitive bidding through e-Tendering mode (Single stage two cover system)
  • Bid Submission Deadline: 12.02.2026 up to 15:00 Hrs. IST
  • Bid Validity: 120 Days
  • Time of Completion: Phase-I: 02 Months; Phase-II: 10 Months; Total: 12 Months

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-01-23
Tap “Open the PDF” above to view this document.
Notice 2026-01-23
Notice 2026-01-23
Document details
Official titleShort-term and permanent rectification works of damaged stretches, as per the recommendations of IIT Bombay, along with the balance works of the project, namely “Rehabilitation & Up-gradation of section from Km 242.00 to Km 298.00 of NH-4 in the UT of Andaman & Nicobar Islands (Package-II)”, to be executed at the Risk & Cost of the existing EPC Contractor on Percentage Rate basis during FY 2025–26.
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2026
Closing date12-02-2026