(i) Strengthening of Udaipur–Sabroom section from km 55.000 to km 127.372 of NH-08 and (ii) Raising and drainage provision in selected stretches of Agartala-Udaipur section of NH-08 in the State of Tripura on EPC mode.
What is this tender for?
The Ministry of Road Transport & Highways, through National Highways & Infrastructure Development Corporation Ltd. (NHIDCL), is contracting for the strengthening of a section of National Highway 08 (NH-08) from km 55.000 to km 127.372 between Udaipur and Sabroom, and raising and drainage work in selected stretches of the Agartala-Udaipur section of NH-08 in Tripura, on an EPC (Engineering, Procurement, Construction) basis.
Who can bid / win?
Bidders must meet eligibility requirements including financial capacity (certified by statutory auditor), technical capacity, and compliance with local content requirements for Class-I or Class-II Local Supplier. Specific thresholds for turnover, experience, or certifications are not stated in the document.
Key terms
- Estimated project cost: Rs. 157.81 Crore (exclusive of GST)
- Completion period: 60 months
- Maintenance period: 18 months
- Bid submission deadline: 05.03.2026 (up to 1100 hours IST)
- Bid validity: Not stated
- Contract duration: 60 months (construction) + 18 months (maintenance)
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: archive) |
| Year | 2026 |
| Closing date | 05-03-2026 |
| Documents | 7 · changed 1× after publishing |
Highlights & Points worth asking
These are factual observations drawn mechanically from the documents below — not findings, opinions, or allegations of wrongdoing. Verify each against the linked original.
What we observed
- The department changed this document 1 time after first publishing it.
Points a citizen might reasonably ask
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →