NHIDCL requires ₹14.72 lakh e-bank guarantee for Uttarakhand highway bid

NHIDCL is inviting bids for short-term maintenance and rehabilitation of a 100 km section of NH-7 (Old NH-58) in Uttarakhand, from Rudraprayag to Helang.

Bidders must have an average annual turnover of at least Rs. 7.36 Cr over the last 3 years. They must also have completed similar work in the last 5 years, meeting one of the following: a single work of Rs. 3.68 Cr, two works of Rs. 2.58 Cr each, or three works of Rs. 1.84 Cr each. Bidders must be registered on the e-procurement portal (eorocure.gov.in) with a valid user ID.

  • Estimated Cost: Rs. 7.36 Cr (Excl. GST)
  • Bid Security: Rs. 14.72 Lakhs (e-Bank Guarantee only)
  • Contract Duration: 12 months
  • Bid Validity: 120 days from submission deadline
  • Tender Type: e-tendering (Open)
  • Bid Document Cost: Rs. 11,800 (Non-refundable)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-03-02
Tap “Open the PDF” above to view this document.
Notice 2026-03-02
Corrigendum 1 2026-03-02 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 2026-03-02 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 3 2026-03-02 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 4 2026-03-02
Tap “Open the PDF” above to view this document.
Corrigendum 5 2026-03-02
Tap “Open the PDF” above to view this document.
Document details
Official titleShort Term Maintenance and Rehabilitation work of 2 lane +PS highway from Km. 368.000 to Km. 468.000 of Rudraprayag to Helang on NH-7 (Old NH-58) under M&R Head and at Risk & Cost of EPC Contractor in the State of Uttarakhand
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2026
Closing date09-03-2026
Documents7 · changed 5× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 5 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?