NHIDCL to spend ₹2.72 crore on landslide clearance in West Bengal

The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is seeking bids for hiring machinery to clear landslides and perform miscellaneous maintenance work on NH-10 (Sevoke-Rangpo section) in West Bengal, covering 26.10 km from km 26.00 to km 52.10, for a 12-month period during FY 2025-2026.

Bidders must have a minimum average annual turnover of Rs. 2.72 crore over the last 3 years, or a single work of Rs. 1.36 crore (minimum 50% of estimated cost), or two similar works each of Rs. 0.96 crore (minimum 35% of estimated cost), or three similar works each of Rs. 0.68 crore (minimum 25% of estimated cost) of similar nature in the last 5 years.

  • Estimated cost: Rs. 2,72,05,555/- (exclusive of GST)
  • Security amount: Rs. 5,44,111/-
  • Bid submission deadline: 27.03.2026
  • Bid validity: 120 days
  • Tender type: Open (e-tendering)
  • Bid documents cost: Rs. 11,800/- (non-refundable)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-03-07
Tap “Open the PDF” above to view this document.
Notice 2026-03-07
Corrigendum 1 2026-03-07 scanned
Tap “Open the PDF” above to view this document.
Document details
Official titleHiring of Machinery for Clearance of Landslides and Miscellaneous works from km 26.00 to km 52.10 on NH-10 (Sevoke-Rangpo section) in the State of West Bengal on percentage Rate Basis during the FY 2025-2026
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2026
Closing date30-03-2026
Documents3 · changed 1× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 1 time after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →