NHIDCL sets ₹5.62 crore STMC bid for Sikkim highway section
NHIDCL is inviting bids for a 12-month Short Term Maintenance Contract (STMC) on National Highway 10 (NH-10) in Sikkim, covering the section from km 64 Singtam Bridge to km 80 Indian Oil Fuel Station Ranipool.
Bidders must be experienced firms/organizations registered on the e-procurement portal and BIMS. They must not be declared Non-Performers or blacklisted/debarred by MoRTH, NHAI, NHIDCL, State PWD, or BRO. Eligibility requires an average annual turnover of Rs. 5,62,12,220/- during the last 3 years AND one of the following experience criteria in the last 5 years: (1) Single work of Rs. 2,81,06,110/-; (2) Two similar works each of Rs. 1,96,74,277/-; or (3) Three similar works each of Rs. 1,40,53,055/-.
- Estimated Cost: Rs. 5,62,12,220/- (Excluding GST)
- Bid Security: Rs. 11,25,000/-
- Contract Duration: 12 months
- Tender Type: e-tendering mode (Percentage Rate Basis)
- Bid Submission Deadline: 02.04.2026 (1600 Hrs)
- Bid Validity: 120 days from the deadline of submission
- Cost of Bid Documents: Rs. 11,800/- (Non-Refundable)
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Document details
| Official title | Short Term Maintenance Contract (STMC) on NH-10 for the section from km 64 Singtam Bridge to km 80 Indian Oil Fuel Station Ranipool under the jurisdiction of PMU-Ranipool, NHIDCL on Percentage Rate Contract Basis for FY 2026-27 in the state of Sikkim |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (archive) |
| Year | 2026 |
| Closing date | 07-04-2026 |
| Documents | 3 · changed 1× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?