NHIDCL sets ₹5.62 crore STMC bid for Sikkim highway section

NHIDCL is inviting bids for a 12-month Short Term Maintenance Contract (STMC) on National Highway 10 (NH-10) in Sikkim, covering the section from km 64 Singtam Bridge to km 80 Indian Oil Fuel Station Ranipool.

Bidders must be experienced firms/organizations registered on the e-procurement portal and BIMS. They must not be declared Non-Performers or blacklisted/debarred by MoRTH, NHAI, NHIDCL, State PWD, or BRO. Eligibility requires an average annual turnover of Rs. 5,62,12,220/- during the last 3 years AND one of the following experience criteria in the last 5 years: (1) Single work of Rs. 2,81,06,110/-; (2) Two similar works each of Rs. 1,96,74,277/-; or (3) Three similar works each of Rs. 1,40,53,055/-.

  • Estimated Cost: Rs. 5,62,12,220/- (Excluding GST)
  • Bid Security: Rs. 11,25,000/-
  • Contract Duration: 12 months
  • Tender Type: e-tendering mode (Percentage Rate Basis)
  • Bid Submission Deadline: 02.04.2026 (1600 Hrs)
  • Bid Validity: 120 days from the deadline of submission
  • Cost of Bid Documents: Rs. 11,800/- (Non-Refundable)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-03-12
Tap “Open the PDF” above to view this document.
Notice 2026-03-12
Corrigendum 1 2026-03-12 scanned
Tap “Open the PDF” above to view this document.
Document details
Official titleShort Term Maintenance Contract (STMC) on NH-10 for the section from km 64 Singtam Bridge to km 80 Indian Oil Fuel Station Ranipool under the jurisdiction of PMU-Ranipool, NHIDCL on Percentage Rate Contract Basis for FY 2026-27 in the state of Sikkim
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2026
Closing date07-04-2026
Documents3 · changed 1× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 1 time after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →