कौन ज़िम्मेदार? KaunZimmedar

NHIDCL to spend ₹127.53 crore widening 9.866 km of NH-244 in Jammu & Kashmir

NHIDCL is inviting bids for the widening and upgradation of a 9.866 km stretch of NH-244 in Jammu & Kashmir from two lanes to four lanes under an Engineering, Procurement, and Construction (EPC) contract.

The document invites bids from 'eligible contractors' but does not specify the detailed eligibility criteria, such as minimum turnover, years of experience, or required certifications, in the provided text.

  • Estimated Cost: Rs. 127.53 Crore (exclusive of GST)
  • Bid Security: Rs. 1.28 Crore
  • Completion Period: 18 Months
  • Maintenance Period: 60 Months
  • Tender Mode: EPC (Engineering, Procurement and Construction)
  • Submission Method: Online via eprocure.gov.in

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-02-05
Tap “Open the PDF” above to view this document.
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Notice 2026-02-05
Corrigendum 1 2026-02-05 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 2026-02-05 scanned
Tap “Open the PDF” above to view this document.
Document details
Official titleWidening/Up-Gradation of Intermittent Two Lane plus Paved Shoulder Stretches to Four Lane between Design Km 148+589 (Existing Km 235+070) (Vailoo) to Design Km 176+532 (Existing Km 263+070) [Donipawa] of 9.866 Km Length on Khellani–Khanabal Section of NH-244 in the UT of Jammu & Kashmir
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2026
Closing date08-04-2026
Documents14 · changed 2× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →