NHIDCL sets ₹6.74 crore price for slope stabilization work on NH-10 in West Bengal
NHIDCL is contracting for slope stabilization and protection works at Chainage Km 49.50 near Bhotebhir on NH-10 in West Bengal on an EPC (Engineering, Procurement, and Construction) basis.
6.74 CroreEstimated Cost: Rs. 6.74 Crore (exclusive of GST)
Who can bid: The document invites International Competitive Bids from eligible contractors. Specific eligibility criteria such as minimum turnover, years of experience, or required certifications are not stated in the provided text, though bidders must provide statutory auditor certifications with UDIN verification and self-certification for Local Content requirements.
Key terms
- Estimated Cost: Rs. 6.74 Crore (exclusive of GST)
- Bid Security: Rs. 0.07 Crore
- Completion Period: 12 months (12 months DLP)
- Tender Type: Online e-tender through Central Public Procurement Portal (CPPP)
- Bid Due Date: 03/04/2026, 11.00 Hrs.
- Bid Validity: 120 days from BID Due Date
- Price Adjustment: Not payable to the Contractor
Also in the document
- Bidders must submit a 'Self Certification' for Local Content requirements (Class-I or Class-II Local Supplier) or be treated as a 'Non-Local Supplier'.
- Price Adjustment shall not be paid to the Contractor.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
National Highways & Infrastructure Development Corporation (NHIDCL)
Tender · 13 Mar 2026
Read it here
Questions a citizen might ask
Observations drawn mechanically from the documents — not findings or allegations.
- The department changed this document 2 times after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?