NHIDCL requires physical bid documents despite online submission for ₹8.71 crore slope project

NHIDCL is contracting for slope stabilization and protection works at Chainage Km 40.05 near the 7th Mile of NH-10 in West Bengal on an Engineering, Procurement, and Construction (EPC) mode basis.

The document invites International Competitive Bids from eligible contractors. Specific eligibility criteria such as minimum turnover, years of experience, or required certifications are not stated in the provided text, though bidders must provide statutory auditor certifications with UDIN verification and self-certification for local content requirements.

  • Estimated Cost: Rs. 8.71 Crore (exclusive of GST)
  • Bid Security: Rs. 0.09 Crore
  • Completion Period: 12 months (12 months DLP)
  • Tender Type: Online e-tender through Central Public Procurement Portal (CPPP)
  • Bid Submission Deadline: 03/04/2026
  • Bid Validity: 120 days from BID Due Date
  • Price Adjustment: Not payable to the Contractor

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-03-13
Tap “Open the PDF” above to view this document.
Notice 2026-03-13
Notice 2026-03-13
Notice 2026-03-13
Notice 2026-03-13
Corrigendum 1 2026-03-13 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 2026-03-13 scanned
Tap “Open the PDF” above to view this document.
Document details
Official titleSlope stabilization and protection works at CH Km 40.05 near 7th Mile of NH-10 during the FY 2026-27 on EPC Mode under NHIDCL in the state of West Bengal
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2026
Closing date22-04-2026
Documents7 · changed 2× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →