NHIDCL extends NH-202 bid deadline to 15/04/2026, estimated cost ₹18.19 crore
NHIDCL is inviting bids for the balance work of strengthening the Ukhrul to Choithar section of NH-202 in Manipur (8.612 km) on an Engineering, Procurement, and Construction (EPC) mode.
The document invites bids from 'eligible contractors' but does not specify minimum turnover, years of experience, required certifications, or entity type requirements in the provided text.
- Estimated Cost: Rs 18.19 Crore (Excl. GST)
- Bid Security: Rs 18.19 Lakh (1% of EPC)
- Maintenance Period: 60 months (5 Years)
- Bid Validity: 120 days from Bid Due Date
- Tender Type: EPC Contract via CPPP portal
- Revised Bid Due Date: 15/04/2026 (up to 1500 Hrs IST)
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Notice
2026-02-25
Notice
2026-02-25
Notice
2026-02-25
Notice
2026-02-25
Notice
2026-02-25
Notice
2026-02-25
Corrigendum 1
2026-02-25
Tap “Open the PDF” above to view this document.
Corrigendum 2
2026-02-25
Tap “Open the PDF” above to view this document.
Corrigendum 3
2026-02-25
scanned
Tap “Open the PDF” above to view this document.
Corrigendum 4
2026-02-25
Tap “Open the PDF” above to view this document.
Document details
| Official title | BALANCE WORK OF STRENGTHENING OF UKHRUL TO CHOITHAR SECTION OF NH-202 FROM EXISTING KM 50+520 TO KM 59+236 (DESIGN CHAINAGE KM 45+600 TO KM 54+212) IN THE STATE OF MANIPUR ON EPC MODE UNDER NH(O)-NE (PACKAGE-4, LENGTH-8.612 KM) |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (archive) |
| Year | 2026 |
| Closing date | 15-05-2026 |
| Documents | 11 · changed 4× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 4 times after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?