NHIDCL extends tender deadline to 23 April for Tripura road repair work
NHIDCL is inviting bids for maintenance and repair work on a 0.775 km section of NH-44A (Lalchera–Kanchanpur via Shivbari road) in Tripura, to be executed at the risk and cost of the EPC Contractor in FY 2025-26.
Bidders must be experienced Road/Bridge Contractors/firms/organizations not declared non-performing or blacklisted by MoRT&H/NHAI/NHIDCL. Eligibility requires an average annual civil turnover of at least Rs. 266.81 Lakhs in the last 5 years and completion of similar works: either two works costing at least 25% of the estimate each, or one work costing at least 35% of the estimate. Joint Ventures (JV) are not allowed; only sole bidders are accepted. Bidders must have a Digital Signature Certificate (DSC).
- Estimated Civil Cost: Rs. 266.81 Lakhs
- Bid Security: 5.34% of estimated cost
- Tender Type: National Competitive Bidding through e-Tendering (Single stage two cover system)
- Bid Submission Deadline: 23.04.2026 (up to 1700 Hrs IST) [As per Corrigendum No. III]
- Bid Validity: 120 Days
- Contract Duration: Not stated in the document (Work is on item rate & work order basis for FY 2025-26)
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Document details
| Official title | Maintenance & Repair work at kanchanpur market area from Km 43+050 to Km 43+560 & Km 43+670 to km 43+935 of Lalchera – Kanchanpur via Shivbari road section on NH-44A (New NH-108) at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis. |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (archive) |
| Year | 2026 |
| Closing date | 19-05-2026 |
| Documents | 5 · changed 3× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 3 times after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?