Maintenance & Repair work at kanchanpur market area from Km 43+050 to Km 43+560 & Km 43+670 to km 43+935 of Lalchera – Kanchanpur via Shivbari road section on NH-44A (New NH-108) at the risk and cost of EPC Contractor in the state of Tripura in the FY 2025-26 on item rate basis & work order basis.
What is this tender for?
Maintenance and repair work on a section of NH-44A (New NH-108) road in Tripura, specifically from Km 43+050 to Km 43+560 and Km 43+670 to Km 43+935 at Kanchanpur market area, to be carried out by an EPC contractor on item rate and work order basis for FY 2025-26.
Who can bid / win?
Bidders must have completed at least one similar work costing not less than 35% of the estimated cost (Rs. 266.81 lakhs) or two similar works costing not less than 25% of the estimated cost each (Rs. 266.81 lakhs each), with a minimum annual turnover of Rs. 266.81 lakhs over the last 5 years. Bidders must not be blacklisted by MoRT&H/NHAI/NHIDCL. Only sole bidders are allowed; no joint ventures permitted.
Key terms
- Estimated cost: Rs. 266.81 lakhs
- Bid document cost: Rs. 10,000 + 18% GST (Rs. 11,800 total)
- Bid security: Not specified
- Tender type: Open (National Competitive Bidding through e-Tendering)
- Bid submission deadline: 23.04.2026
- Bid validity: 120 days
- Contract duration: Not specified
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: archive) |
| Year | 2026 |
| Closing date | 19-05-2026 |
| Documents | 5 · changed 3× after publishing |
Highlights & Points worth asking
These are factual observations drawn mechanically from the documents below — not findings, opinions, or allegations of wrongdoing. Verify each against the linked original.
What we observed
- The department changed this document 3 times after first publishing it.
Points a citizen might reasonably ask
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →