कौन ज़िम्मेदार? KaunZimmedar

NHIDCL sets ₹49.99 crore bid for 5-year West Bengal highway maintenance

NHIDCL is inviting bids for the performance-based maintenance of National Highways 717 and 317A in West Bengal for the financial year 2026-2027.

Bidders must be experienced firms or organizations. Firms declared as Non-Performers or blacklisted/debarred by MoRTH, NHAI, NHIDCL, State PWD, or BRO are excluded. Specific minimum turnover, years of experience, or certification requirements are not stated in this document text.

  • Estimated Bid Cost: Rs. 49,99,99,000/-
  • Bid Security: Rs. 1,00,00,000/-
  • Bid Document Fee: Rs. 10,000 + 18% GST
  • Contract Duration: 60 Months
  • Tender Type: National Competitive Bidding (e-tendering mode)
  • Bid Due Date: 09.04.2026 at 17:00 hrs IST
  • Bid Validity: 120 days from Bid Due Date

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-03-09
Tap “Open the PDF” above to view this document.
Notice 2026-03-09
Notice 2026-03-09
Corrigendum 1 2026-03-09 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 2026-03-09 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 3 2026-03-09 scanned
Tap “Open the PDF” above to view this document.
Document details
Official titlePerformance Based Maintenance Contracts (PBMC) on (i) NH 717 for highway starting from its junction with NH-17 near Baradighi connecting NH-27 near Mainaguri, Cangrabandha and terminating at Indo/Bangladesh Border in the State of West Bengal and (ii) NH-317A for highway starting from its junction with NH317 near Hasimara connecting Jaigaon and terminating at Indo/Bhutan Border in the state of West Bengal during the FY 2026-2027
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2026
Closing date19-05-2026
Documents6 · changed 3× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 3 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →