Short Term Maintenance Contract for Machinery Deployment and Road Maintenance at km. 94+750 to km. 95+600 on NH-717A near Reshi border in the State of West Bengal during the FY 2026-2027.
What is this tender for?
The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is contracting for short-term maintenance of machinery deployment and road maintenance on a 0.850 km stretch of NH-717A near Reshi border in West Bengal, covering routine maintenance of road assets including carriageway, shoulders, bridges, drains, signage, and plantation.
Who can bid / win?
Bidders must have: (1) Average annual turnover of Rs. 7.75 crore over the last 3 years; (2) Experience with at least one work of Rs. 3.88 crore (minimum 50% of estimated cost), or two works of Rs. 2.71 crore each (minimum 35% each), or three works of Rs. 1.94 crore each (minimum 25% each) over the last 5 years; (3) Registration on e-procurement portal (eprocure.gov.in) valid until bid submission date; (4) No blacklisting by Central/State government or public sector bodies; (5) Submission of required documents including turnover proof, experience certificates, equipment details, and local content self-certification.
Key terms
- Estimated cost: Rs. 7,75,26,344/- (excluding GST)
- Security amount: Rs. 15,50,000/- (e-Bank Guarantee/NEFT/RTGS)
- Tender type: Open (e-tendering)
- Bid submission deadline: 21.05.2026 (17:00 Hrs)
- Bid validity: 120 days
- Contract duration: 6 months (period-6 months)
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: archive) |
| Year | 2026 |
| Closing date | 21-05-2026 |
| Documents | 4 · changed 2× after publishing |
Highlights & Points worth asking
These are factual observations drawn mechanically from the documents below — not findings, opinions, or allegations of wrongdoing. Verify each against the linked original.
What we observed
- The department changed this document 2 times after first publishing it.
Points a citizen might reasonably ask
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →