Restoration works under “Specialized Repairs” through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis (2nd Call)
No plain-language summary yet for this document — it may be a scanned image. The original is below.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Notice
2026-05-17
scanned
Tap “Open the PDF” above to view this document.
Notice
2026-05-17
Document details
| Official title | Restoration works under “Specialized Repairs” through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala in the State of Tripura in the FY 2025-26 on percentage basis and work order basis (2nd Call) |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (archive) |
| Year | 2026 |
| Closing date | 27-05-2026 |
| Documents | 2 |