Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Nat’l Highways Infra Dev Corp

Tunnel experts empanelled for 2 years, ₹25,000 per day fee

NHIDCL is seeking to empanel Tunnel Experts for third-party technical inspections and reviews of tunnel projects, including DPR studies and site inspections.

Who can bid: Retired government/PSU engineers with at least 10 years' experience as Superintending Engineer (SE) or equivalent, or private sector experts with 20 years' experience in tunnel projects of 4 km+ length. Must have relevant engineering degrees, 20+ years total experience, 15+ years in tunnel projects, and 10+ years in construction/supervision of 4 km+ tunnels. Private sector experts with TBM/underwater tunnel expertise may qualify without strict experience requirements.

Key terms

  • Last date for submission: 22.05.2026
  • Maximum age: 70 years
  • Empanelment period: 2 years (max 70 years age)
  • Per day fee: Rs. 25,000
  • Lodging/Boarding: Arranged per ED level
  • Travel expenses: Rs. 20/km for road travel
  • DA: Rs. 2,000/day

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

National Highways & Infrastructure Development Corporation (NHIDCL)

Tender

Corrigendum 1 scanned image · 0.4 MB Open the document On nhidcl.com ↗
Read it here
Questions a citizen might ask

Observations drawn mechanically from the documents — not findings or allegations.

  • The department changed this document 1 time after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.