कौन ज़िम्मेदार? KaunZimmedar

Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km).

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Notice 2025-12-12
Corrigendum 1 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 3 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 4 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 5 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 6 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 7 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 8 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 9 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 10 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 11 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 12 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 13 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 14 2025-12-12 scanned
Tap “Open the PDF” above to view this document.
Document details
Official titleDevelopment, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-2: From Km 45+645 To Km 78+600, Design Length – 32.955 Km).
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2025
Closing date08-07-2026
Documents28 · changed 14× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 14 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →